Owlerton Stadium

This was an early Kuppersbusch project and one of the most challenging. The kitchen was on the third floor. The range was manufactured in three separate sections it had to be carried up the stairs by hand then assembled inside the kitchen. The customer wanted the equipment to cater for two busy scenarios. It needed to provide fast food for event spectators and to be able to cook for more formal functions.